Client: City of Unalaska
Owner: City of Unalaska
Cost of Work: $9 million
The U.S. Coast Guard and the City of Unalaska combined to
finance a 530-foot dock for utilization by the USCG and
the City. The dock consists of a heavy-duty 325-foot OPEN
CELL SHEET PILE® dock and a medium-duty 180-foot pile-supported
concrete deck panel dock with 2.5± acres of upland
fill. Approximately 75% of the piles had to be rock-anchored
to meet earthquake restrictions. Both dock portions are
faced with a heavy-duty fendering and mooring system. The
dock face provides water, fuel, electrical, telecommunications
and sewer-age systems. Upland facilities consist of a combination
tele-phone-electrical-water building and a fuel distribution
shack along with a high-mast lighting system. PND was responsible
for upland and bathymetric surveys and geotechnical investigation;
conceptual, preliminary and final design; public meetings
to present preliminary and final design layouts; contract
preparation, bid assistance and submittal review; fabrication
inspection; construction administration; and close-out,
including as-builts.
|