Key to the success of this
project was construction of a 315-by-140-foot dock capable
of withstanding offloading of large modules as well as severe
environmental conditions. The OPEN CELL® approach eliminated
the need for deep toe embedment while offering the necessary
strength, at a significant cost savings over tied back or
cantilever sheet pile walls. Another unique feature was
construction of the dock in standalone halves, connected
by a closure cell after a pipeline had been laid.
|